Evidence Intelligence Platform

Project intelligence you can trace back to the evidence.

PEIS transforms fragmented project records, schedules, correspondence, and contractual documentation into structured, evidence-backed evaluations while preserving traceability to underlying sources.

Explore PEIS Founding Beta
Core Analytical Architecture

From Fragmented Records to Traceable Project Intelligence

Heterogeneous project records enter PEIS, where deterministic models and semantic extraction construct an unbroken provenance graph delivering decision-ready intelligence.

Project Records

Heterogeneous Input
๐Ÿ“„
Contracts & Agreements
Prime Contract, GMP, Exhibits
PDF
๐Ÿ“Š
CPM Schedules
Baseline & Monthly Updates
XER / XML
๐Ÿ“จ
RFIs & Clarifications
Technical Questions & Responses
MSG / PDF
๐Ÿ“‹
Daily Construction Logs
Superintendent Reports & Headcount
CSV / PDF
โœ‰๏ธ
Official Correspondence
Notice of Delay, Directive Letters
EML / PDF
๐Ÿ“
Change Orders & Mods
Proposed & Executed PCOs
PDF / XLSX
๐Ÿ“
Submittals & Shop Drawings
Product Data & Engineering Reviews
PDF
๐Ÿ“ท
Field Photos & As-Builts
Site Progress Imagery & Redlines
JPG / CAD

PEIS Analytical Core

Engine v0.1
Ingestion & Parsing Phase 1

Normalized document ingestion with cryptographic SHA-256 content hashing at source boundaries.

Cross-Record Correlation Phase 2

Extracts entities, contract clauses, schedule activities, and timestamps into a unified semantic graph.

Contradiction Engine Phase 3

Identifies factual discrepancies, notice non-compliance, and conflicting dates across heterogeneous sources.

Dependency Revalidation Continuous

Automatically propagates new evidence downstream to recalculate evaluations, findings, and risk scores.

Provenance Graph: 100% Deterministic Citations

Project Intelligence

Traceable Outputs
โฑ๏ธ
Master Chronology
Multi-source unified timeline
Timeline
โš ๏ธ
Contradiction Detection
Discrepancy & dispute flags
Flagged
๐Ÿ“ˆ
Schedule Intelligence
CPM float & path slippage
CPM DNA
๐Ÿ”—
Evidence Mapping
Requirement โ†” Evidence nodes
Linked
๐Ÿ“‘
Defensible Findings
Verifiable factual synthesis
Forensic
๐ŸŽฏ
Risk Quantification
Delay & cost exposure scoring
Scored
๐Ÿ›ก๏ธ
Decision Support
Human-governed action packages
Human Gate
Passing
Internal Regression & Acceptance Baseline
100%
Cryptographic Provenance Traceability
Human
Final Decision Authority
Continuous
Dependency Revalidation
The Evaluation Methodology

The 8-Stage Evaluation Pipeline

PEIS enforces a rigorous, continuous provenance chain connecting every raw source record to executive decision support while preserving full auditability.

01 Ingestion

Source

Contracts, CPM schedules, RFIs, daily logs, submittals & official correspondence.

02 Extraction

Requirement

Contractual clauses, milestone commitments, notice deadlines & technical specifications.

03 Provenance

Evidence

Contemporaneous timestamped records, verbatim excerpts & cryptographic content hashes.

04 Analysis

Evaluation

Deterministic analytical models combined with governed semantic extraction mapping.

05 Inspection

Contradiction

Automated detection of factual discrepancies, notice lapses & conflicting records.

06 Synthesis

Finding

Defensible, evidence-supported factual synthesis with full cross-document citation.

07 Quantification

Risk

Schedule delay slippage, cost exposure & contractual risk quantification.

08 Human Authority

Decision

Human professional review, expert judgment & executive leadership governance.

๐Ÿ”„
Continuous Dependency-Aware Revalidation: Downstream findings, contradiction states, and risk scores automatically re-evaluate whenever source records or evidence are updated.
Active Provenance Engine
Explore Detailed Evaluation Architecture โ†’
Analytical Command Center

Visual Intelligence Panels

PEIS replaces tedious manual cross-referencing with structured, auditable analytical interfaces engineered for high-stakes capital project evaluation.

Master Chronology & Event Mapping

ILLUSTRATIVE DEMO CHRONOLOGY_VIEW

Correlates multi-source documentary events into an authoritative, chronological chain of facts:

2026-03-14 09:30 EST ยท [CONTRACT]
Notice of Foundation Design Revision issued under Section 12.4. Requires 7-day impact notification.
DOC: Contract_ExB.pdf (p.42) HASH: #8a3f9e
2026-03-28 16:15 EST ยท [CORRESPONDENCE]
Contractor Delay Notice submitted (14 days post-revision). Potential notice timeliness contradiction flagged.
DOC: Letter_GC_048.eml FLAG: Notice Timeliness
2026-04-01 08:00 EST ยท [SCHEDULE]
Monthly Update #04 submitted. Critical path shifts to Activity F-102 (Drilled Shafts). Total float reduced by 12 days.
DOC: Sched_Upd04.xer ACT: F-102

Evidence Mapping & Provenance Linkage

ILLUSTRATIVE DEMO PROVENANCE_GRAPH

Links contractual requirements directly to verbatim supporting records and counter-evidence:

CONTRACT REQUIREMENT Spec 03300 ยง 3.2.1
"Concrete placement shall not occur when ambient temperature is below 40ยฐF without approved cold-weather protection plan."
โœ“ SUPPORTING EVIDENCE (98% Confidence) DCR-2026-01-18.pdf
Daily Log #114: "Ambient temp recorded at 34ยฐF at 07:00. Thermal blankets deployed in accordance with Submittal 03300-04."
โœ— COUNTER-EVIDENCE (Discrepancy) RFI-089-Resp.pdf
Engineer response indicates cold-weather heating logs were not submitted for Pour #3B on Jan 18.

Contradiction & Discrepancy Detection

ILLUSTRATIVE DEMO CONTRADICTION_DETECTOR
โš ๏ธ DISCREPANCY DETECTED: Unforeseen Delay vs Contemporaneous Log ID: #DISC-409
RECORD A: Contractor Claim #07

"Work in Area C was completely halted for 10 consecutive days due to site access restrictions."

Source: Claim_PCO_07.pdf
RECORD B: Daily Field Logs (Superintendent)

"Area C: 12 ironworkers and 2 cranes active on structural framing without impediment."

Source: DailyLog_Days_45-55.csv
PEIS Finding Synthesis: Contemporaneous daily reports directly contradict total site access restriction assertion. Human review recommended.

Schedule DNA & Float Intelligence

ILLUSTRATIVE DEMO CPM_FLOAT_ENGINE

Deterministic CPM schedule analysis tracking float erosion and critical path movements:

Activity A-1040: Substructure Concrete Pour -14 Days Float (Critical)
Baseline: 45 Days Actual/Forecast: 68 Days (+23d Variance)
Activity A-1090: MEP Underground Rough-In 0 Days Float (Near-Critical)
Baseline Float: +12 Days Remaining Float: 0 Days
Schedule Correlation: Substructure delay directly consumes MEP rough-in float.

*All metrics, dates, and text shown in analytical panels are synthetic demo data formatted to illustrate system capabilities and do not represent actual customer or project results.

View Full Platform Capabilities Matrix
Enterprise Solutions

Engineered for High-Stakes Project Stakeholders

PEIS provides specialized evaluation intelligence across every major participant in complex capital projects.

Owners & Agencies ๐Ÿ›๏ธ

Independent Evaluation & Oversight

Maintain objective, documentary visibility into contractor claims, milestone progress, and delay exposure across multi-billion-dollar capital programs.

  • Defensible evaluation of contractor delay & cost claims
  • Early detection of critical path schedule slippage
  • Unbroken audit trails for public accountability & compliance
Contractors ๐Ÿ—๏ธ

Contemporaneous Substantiation

Transform scattered daily logs, RFIs, and submittals into structured evidence packages that prove entitlement, delay causation, and notice compliance.

  • Automated contractual notice deadline tracking
  • Cross-record correlation proving owner-caused delays
  • Contemporaneous alignment between field logs & schedules
Advisors & Consultants ๐Ÿ“Š

Forensic Synthesis & Schedule Analytics

Accelerate forensic delay analysis and schedule evaluations from weeks to hours with deterministic CPM correlation and discrepancy detection.

  • High-speed multi-source document reconciliation
  • Schedule DNA comparison and float erosion analysis
  • Structured, citation-backed client deliverables
Legal & Claims โš–๏ธ

Dispute Reconstruction & Provenance

Build trial-ready and arbitration-grade factual timelines with cryptographically verifiable provenance to every underlying exhibit and witness statement.

  • Automated contradiction discovery across adverse records
  • Deterministic source citations linked to exact page numbers
  • Comprehensive factual matrix for dispute resolution
Explore All Industry Use Cases โ†’
Trust & Governance

Enterprise Security & Provenance Architecture

PEIS is built from first principles on deterministic computation, cryptographic provenance, and explicit human decision authority.

๐Ÿ”’

Controlled Access & Isolation

Granular role-based and attribute-based access controls (RBAC/ABAC) with strict workspace boundaries preventing data co-mingling.

๐Ÿ”—

Cryptographic Provenance

Every finding, score, and citation maintains a deterministic SHA-256 hash linking back to original source documents and page numbers.

๐Ÿ”„

Continuous Revalidation

Dependency-aware recalculation ensures that new evidence automatically updates downstream evaluations without manual tracking.

๐Ÿ‘ค

Human-in-the-Loop Authority

PEIS provides analytical augmentation and factual synthesis. Professional human experts maintain final evaluation and decision authority.

๐Ÿ›ก๏ธ

Edge Security Architecture

Static edge distribution with strict Content Security Policies, TLS 1.3 encryption, and zero database query surfaces on presentation tiers.

โœ…

Internal Test Harness

PEIS has completed internal regression and acceptance testing against its governing validation baseline across core parser, correlation, and provenance modules. Independent external validation is planned under the Founding Beta program.

Review Full Security & Governance Principles
Founding Beta Program

Evaluate PEIS on Real-World Capital Projects

We are recruiting qualified project owners, agencies, contractors, and project controls leaders for the controlled PEIS Founding Beta Program.

Data Boundary & Onboarding Notice: Participation is application-based. The public application portal collects only high-level organizational qualification metadata. Confidential project records, classified materials, CUI, and credentials are strictly prohibited on public forms and are handled via dedicated, isolated onboarding.
Apply for Founding Beta Program Contact Technical Team