Integrity & Transparency

Validation & Testing Status

We maintain total transparency regarding the current analytical testing status of PEIS, documenting internal benchmark results alongside explicit testing boundaries and limitations.

AUTHORITATIVE INTERNAL REGRESSION STATUS
Internal Validation Baseline Passing
Release Candidate: Gate 4 RC1  |  Regression Harness: Passing  |  Baseline Status: Frozen
● Internal Validation Baseline Frozen

Testing Status & Validation Boundaries

Internal Testing Completed: PEIS has completed internal regression and acceptance testing against its governing validation baseline.

Independent External Validation Status: Independent external validation has not yet been completed. Internal test results, while exhaustive across baseline corpora, do not constitute third-party certification, government endorsement, or universal accuracy guarantees.

Founding Beta Purpose: The Founding Beta Program is intended in part to obtain additional real-world performance, usability, and market evidence across diverse project environments. Beta participation gathers operational evidence and user feedback; it does not replace, constitute, or represent formal independent external validation.

Testing Coverage

The 8 Core Analytical Validation Disciplines

Every PEIS release candidate undergoes automated regression testing across eight distinct functional domains.

VAL_DISC_01 VERIFIED

1. Controlled Benchmark Testing

Tests analytical pipelines against controlled synthetic and historical project datasets with known outcomes ("ground truth") to verify accuracy in fact extraction and timeline assembly.

  • Target Metric Extraction Recall & Precision
  • Verification Method Ground-Truth Corpus Comparison
VAL_DISC_02 VERIFIED

2. Master Regression Testing

Automated end-to-end test execution covering API endpoints, data parsers, schedule analyzers, and report generation modules to prevent functional regressions.

  • Target Metric 100% Pipeline Coverage
  • Verification Method Automated CI/CD Regression Harness
VAL_DISC_03 VERIFIED

3. Provenance Integrity Testing

Verifies cryptographic SHA-256 hash preservation, bounding coordinate mapping, and document immutability throughout the entire analytical lifecycle.

  • Target Metric Cryptographic Immutability
  • Verification Method SHA-256 Checksum Validation
VAL_DISC_04 VERIFIED

4. Traceability & Citation Testing

Asserts that 100% of generated findings, scores, and contradiction flags contain valid, inspectable hyperlinks to exact source excerpts without orphaned assertions.

  • Target Metric Zero Orphan Assertions
  • Verification Method Citation Reference Graph Walk
VAL_DISC_05 VERIFIED

5. Requirement & Evidence Evaluation

Tests rule-based logic algorithms assessing contractual compliance (e.g., 10-day notice limits, submission turnaround windows, liquidated damage triggers).

  • Target Metric Deterministic Logic Evaluation
  • Verification Method Contract Clause Assertion Matrix
VAL_DISC_06 VERIFIED

6. Contradiction Analysis Testing

Validates discrepancy detection algorithms on intentionally conflicted record pairs (e.g., weather reports vs inspector delay claims) to verify deterministic detection sensitivity on baseline discrepancies.

  • Target Metric Conflict Detection Sensitivity
  • Verification Method Contradiction Synthetic Pair Ingestion
VAL_DISC_07 VERIFIED

7. Schedule Intelligence & CPM Logic

Tests mathematical Critical Path Method calculations, float erosion tracking, and logic change detection on complex multi-thousand-activity Primavera schedules.

  • Target Metric CPM Float & Variance Precision
  • Verification Method XER / XML Schedule Regression Suite
VAL_DISC_08 VERIFIED

8. Dependency & Revalidation Cascades

Simulates real-world evidence additions and document amendments to confirm that affected downstream evaluations are accurately flagged and recalculated.

  • Target Metric Automated Invalidation Cascades
  • Verification Method DAG Dynamic Update Trigger Tests
Transparent Boundaries

Documented Scope & Known Limitations

We believe analytical software credibility begins with a clear statement of operating limits.

1. Dependency on Input Record Completeness

PEIS evaluates evidence based strictly on ingested records. If critical project correspondence, unrecorded verbal agreements, or missing schedule updates are not provided to the system, evaluations will reflect the documentary record as ingested.

2. Non-Autonomous Decision Authority

PEIS is an analytical intelligence platform, not an autonomous arbiter, judge, or licensed professional engineer. All evaluations and findings must be reviewed and authorized by qualified professionals.

3. OCR Quality Constraints

While PEIS incorporates optical character recognition for scanned records, severely degraded scans, handwritten field notes, or damaged historical plans may require human transcription assistance.

Founding Beta Program

Help Validate PEIS on Your Project Use Cases

Join qualified industry practitioners in evaluating PEIS against real-world project records within our controlled beta program.

Apply for Founding Beta Program →